rdf:type | <https://jpsearch.go.jp/term/type/資料一般> |
rdfs:label | "Infection Control Issues in the Environment of Care" |
schema:name | "Infection Control Issues in the Environment of Care" @ja |
ns0:accessInfo | #accessinfo |
ns0:agential 2 | _:vb11319615 (an orphan bnode) |
ns0:agential | _:vb11319616 (an orphan bnode) |
ns0:sourceInfo | #sourceinfo |
ns0:spatial | _:vb11319617 (an orphan bnode) |
ns0:temporal | _:vb11319618 (an orphan bnode) |
schema:contributor | <https://jpsearch.go.jp/entity/ncname/Kristine_M.Miller> (➜ "Kristine M.Miller") |
schema:dateCreated | "2005" |
schema:description 2 | "内容記述: IntroductionChapter1: OverviewInfection Control at the Joint Commisiion Revised Stanards Oter IC InitiativesThe EC / IC Relationship The Periodic Environmental TourChapter2: PersonnelThe EC / IC PartnershipHand Hygiene Dispenser PlacementStaff Education and Training Contaract Workers Annual TrainingSharps EducationChapter3: EquipmentCleaning TechniquesSterilization Sterility AuuranceIC and Biomedical EngineeringEndoscopesReusable Equipment: Reprocess or Discard ?Centralized ProcessingCNS PrecautionsChapter4: UtilitiesIC in AIR Handing and Ventilation Systems Pressure Relationships Air Exchange Rates Filtration Maintenance Technologies on the Horizon Preventing Sick Building Syndrome What Causes SBS ? Additional Ways to Prevent SBSIC in Water Distribution Systems LegionellaChapter5: Environmental ServicesHousekeeping Which Disinfectant Hot SpotsLaundryRegulated Medical Waste Disposal Sharps ManagementWorking TogetherChapter6: ConstructionIC Risk Assessment A Multidisciplinary ProcessBefore Construction Worker Education Air Handing Final PreparationDuring ConstructionAfter ConstructionRisk Reduction Architectural ElementsCase Study: Building in InfectionIC from the Ground UPUser GroupsThe ART of CompromiseFilters and Copper - Silver IonsChapter7. Emergency ManagementDetermmining Surge CapacityCase Study: What Toronto HospitalsLearned About Surge Capacity from SARSConducting Decontamination Planning Decontamination FacilitiesCase Study: Anthrax Threat TriggersEM Plan ImplementationCase Study: Drilling for a Bioterrorist EventChapter8: Performance Improvement and MeasurementA Teamwork ApproachWhat to Measure Construction and Other Contract WorkersCollecting Data using Benchmarking Improve PerformanceMeasuring Compliance with National PatientSafety Goal Hand Hygiene Compliance Using RCA Following a Sentinel EventInvolving ICUsing Data TOols to IMprove the IC Program Measuring Staff Competence...(more)" |
schema:description | "公開者: US" |
schema:publisher | <https://jpsearch.go.jp/entity/ncname/Joint_Commission> (➜ "Joint Commission") |
schema:spatial | <https://jpsearch.go.jp/entity/place/アメリカ> |
schema:temporal | <https://jpsearch.go.jp/entity/time/2005> (➜ "2005年") |